Wednesday, May 15, 2013
CLE Internship 2
Gig 3 day 2. we mostly finished tearing out the old fly system at Dowling high school. we took out the rest of the arbors, along with all of the lift lines, loft blocks, head blocks, toe blocks and lock rails. we even took out the angle iron that was bolted to the building structure to hold all the head/loft blocks up. we basically gutted ALL of their rigging equipment. I also learned that it's easy to get the hang of driving a scissor lift. especially since i was showing up my boss. learned a little bit more about rigging and what is considered proper form now V.s. then too. and there is a hell of a lot of difference. I would tell you what I learned but that would require way too much time and I have other things to do. so have a fantastic day! today was 6.5 hours of work. new total is 27 hours
Justin "Chops" Voga