Saturday, August 4, 2012

One down, one to go

Finally, after 2 nights of having to call the show due to weather, we finally opened Winnie the Pooh. Out of all the 3 shows we have been a part of, this is the show that we don't want to call due to weather. We never had a true tech rehearsal, so a lot of the lighting stuff has been changing on the fly like adjusting the them and changing gels. We added a green gel to the spotlight I run to add an eerie feel to 2 different moments. This is the first show I've done where the director has added what she's called a "Glee" show, before the main production because of how short the main show is. The set didn't change from The Aracoma Story. The only changes were the 3 flats and 2 small huts that we built. Its amazing what can happen when we get to do our job and build different flats instead of just platforms or setting up pieces that were pre-made. After tonight, we've got one week before we start cleaning up and winterizing the theatre.

No comments: